Compute that's sold out everywhere else. Delivered in weeks.

Forge Canvas sources AI hardware on request — from GB10 Blackwell workstations to datacenter GPUs. Direct channel relationships let us secure allocation fast, with written quotes that hold beyond two weeks.

2–8 wksTypical procurement time
14+ daysQuote validity, in writing
40+AI-focused SKUs on request
EUShipping EU-wide
01 — Catalogue

What we source.

A selection of what we place most often. Not listed? If it runs AI workloads, ask. Times shown are procurement times — shipping to your location comes on top.

A / Desktop supercomputers

NVIDIA GB10 Grace Blackwell

128 GB unified memory, up to 1 PFLOP FP4. Every OEM variant, singles or clustered pairs.

  • NVIDIA DGX SparkFounders Edition · 4 TB NVMe · ConnectX-71–2 wks
  • ASUS Ascent GX10GB10 · 1–4 TB NVMe1–2 wks
  • Dell Pro Max with GB10GB10 · Dell ProSupport eligible2–3 wks
  • HP ZGX Nano G1nGB10 · HP AI software stack2–3 wks
  • Lenovo ThinkStation PGXGB10 · 1–4 TB NVMe2–3 wks
  • MSI EdgeXpertGB10 · also Gigabyte AI TOP ATOM, Acer Veriton GN1002–4 wks
  • NVIDIA DGX StationGB300 Grace Blackwell Ultra · 784 GB coherent memoryOn request
B / Graphics cards

NVIDIA RTX & RTX PRO Blackwell

Consumer flagships and pro cards for local inference, fine-tuning and render nodes. Retail and OEM boards.

  • GeForce RTX 509032 GB GDDR7 · Founders & partner boards1–2 wks
  • GeForce RTX 508016 GB GDDR71–2 wks
  • RTX PRO 6000 Blackwell96 GB GDDR7 ECC · Workstation, Max-Q, Server Edition2–5 wks
  • RTX PRO 5000 Blackwell48 GB GDDR7 ECC2–5 wks
  • RTX PRO 4500 / 4000 Blackwell32 GB / 24 GB GDDR7 ECC2–5 wks
C / Datacenter

NVIDIA Hopper & Blackwell servers

PCIe accelerators and 8-GPU HGX platforms, built by Supermicro, Dell, HPE, Lenovo or Gigabyte.

  • NVIDIA HGX B3008× Blackwell Ultra · 2.3 TB HBM3eOn request
  • NVIDIA HGX B2008× B200 · 1.4 TB HBM3e · NVLink 5On request
  • NVIDIA H200 NVL / SXM141 GB HBM3e · PCIe or HGX 8-GPUOn request
  • NVIDIA L40S48 GB GDDR6 · inference & visual computeOn request
D / AMD

AMD Instinct, Radeon PRO & Ryzen AI

ROCm-ready accelerators and high-memory APU systems — often the faster path when NVIDIA is constrained.

  • AMD Instinct MI355X / MI350X288 GB HBM3E · 8-GPU OAM platformsOn request
  • AMD Instinct MI325X / MI300X256 / 192 GB HBM3(E)On request
  • Radeon AI PRO R970032 GB GDDR6 · RDNA 4 · multi-GPU workstations1–2 wks
  • Radeon PRO W790048 GB GDDR6 ECC1–2 wks
  • Ryzen AI Max+ 395 systems128 GB unified · Framework Desktop, HP Z2 Mini G1a1–3 wks
E / Apple silicon

Mac Studio & Mac mini

Maximum unified memory for running large models locally. Custom build-to-order configs, sourced in volume.

  • Mac Studio M5 UltraUp to 512 GB unified memory · 80-core GPU · 16 TB SSD2–4 wks
  • Mac Studio M5 MaxUp to 128 GB unified memory · 40-core GPU1–3 wks
  • Mac Studio M3 UltraUp to 512 GB unified memory · previous gen, channel stock2–4 wks
  • Mac mini M5 ProUp to 64 GB · Thunderbolt 5, cluster-friendly1–2 wks
  • Mac mini M6Up to 32 GB · compact edge & inference nodes1–2 wks
F / Fabric & infrastructure

Networking, storage & parts

The components that stall a cluster build when they're missing.

  • NVIDIA ConnectX-7 / -8 SuperNIC400–800 Gb/s · InfiniBand & Ethernet2–4 wks
  • Quantum-2 & Spectrum-X switchesNDR InfiniBand · 800G EthernetOn request
  • Transceivers & DAC/AOC cablesOSFP · QSFP112 · QSFP-DD1–2 wks
  • Enterprise NVMe & server memoryU.2 / E3.S Gen5 SSDs · DDR5 RDIMM1–2 wks

Times are typical procurement times until the hardware is secured. Shipping to your location is added and stated in your quote. On request = datacenter-scale, priced and scheduled per project.

Ask for an unlisted part →
02 — Why Forge Canvas

Allocation is the bottleneck.
We solve the allocation.

[01]

Direct channel contacts

Relationships with distributors and OEM partners across Europe and Asia give us access to quota that never reaches public shops.

[02]

Weeks, not quarters

Most orders are sourced within two to eight weeks — including hard-to-get parts with export conditions or limited release. Shipping to your location comes on top.

[03]

Quotes that hold

Prices move daily. Our written offers are typically valid for more than two weeks — time to get your budget signed off.

03 — Process

From request to rack.

  1. DAY 0

    Send your list

    Part numbers, quantities, delivery address. A rough spec is fine — we'll match it.

  2. DAY 1–2

    Written quote

    Fixed price, confirmed lead time, validity date. Typically 14+ days to decide.

  3. WEEK 1

    Allocation secured

    On order confirmation we lock stock with our partners and handle export paperwork.

  4. WEEK 2–8

    Sourced & shipped

    Once the hardware is secured, we ship it insured to your door in Malta or anywhere in the EU, with full tracking. Transit time depends on your location.

04 — Request a quote

Tell us what you need.
We'll tell you when.

Three quick steps, under a minute. You get a written quote with price, lead time and validity date — usually within one business day.

Prefer email? contact@forge-canvas.com

Step 1 of 3 · Your request~1 min

What are you looking for?

Models, quantities, delivery country, deadline — whatever you already know.

No obligation. No newsletter.